中文 | English  
 
  Navigation:
Project for transmitting and transforming electricity
Enterprise Engineering
Electrified railway construction
Export products
 
 
   
 
Capacitor
 
   
 
Reactor
 
   
 
Discharge Coil
 
   
 
Installation
 
  Search:
Results    
 
  Project for transmitting and transforming electricity
220kV 330kV 500kV
more> 
Panshi 220 kV substation, Jilin Province.
Tengzhai 220 kV substation, Jiangsu Province.
Nanhua 220 kV substation, Tangshan, Hebei Province.
Lvliang 500 kV substation, Shanxi Province.
Yichang 500 kV substation, Hubei Province.
Yongzhou 500 kV substation, Hunan Province.
 
  Enterprise Engineering more> 
Several 10 kv reactive power compensation devices running in Lanqiao 110 kV substation, Tonghua Iron & Steel Group, Jilin Province.
35 kV shunt capacitor bank running in Yongzhou 500 kV substation, Hunan Province.
Assembled shunt capacitor bank running in Hebei 220 kV substation, Fushun, Liaoning Province.
Assembled shunt capacitor bank running in Haicheng 220 kV substation, Liaoning, Province.
Shunt capacitor bank running in Lvshu 220 kV substation, Changzhou, Jiangsu Province.
Shunt capacitor bank running in Zhangjiawan 220 kV substation, Huanggang, Hubei Province.
 
  Electrified railway construction more> 
Assembled capacitor bank for electrified railway running in Baiyinxi substation, Lanzhou, Gansu Province.
 
  Export products more> 
11 kv, 3x150kVar capacitor bank running in Pakistan.
PWB-0.38-45 reactive power compensation running in Ulaanbaatar Electric Distribution Network Company, Mongolia.
TBB10-8016/334-AKW shunt capacitor bank running in Kilamba Kiaxi, Angola
 
 
 
Copyright: Herong Electric.  Address:No.9 Xijin RD, Jingwei Industrial Park, CN-710200, Xi'an City,P.R.China.
Zip: 710075   Tel :029-65699866 029-65699863(Sales) 029-65699867(Fax)
E-mail: zhaoningtop@gmail.com     Web design: www.eyphp.com     陕ICP备13001390号